Before THE 9 KM, ROAD-21
before clearing-going to datano village
WATER TANKER WATERING THE HARD PAN
TIPPERS WAITING TO DUMP GRAVELS
Dumping of gravels.
Grader Spreading Gravels
Grader Spreading Gravels along CH.14 plus
Compactor starting rolling
ROLLER STARTING TO ROLL AFTER SPREADING OF GRAVELS
SUPERVISING WORKS
After road formation
Formwork for culvert
After briding of culvert
Setting of culvert pipes
Setting formwork
Setting culvert formwork
Form work setting ongoing
Pre-coating of 10mm chippings at ch. 2+750
Chip spreader spreading 10mm chippings on bitumen
Bitumen distributor spraying bitumen on the road.
Bitumen distributor still spraying bitumen on the road
Primer sealed surface.
Mason dressing casted kerbs.
Final Bitumen work on the road